Projects

Project cut across multiple locations, for a world-class HIV diagnostics program using Cobas 8800 and 6800 systems with a capacity for several thousands daily throughput tests per location, requiring highest availability / reliability power supply. Power solution was a hybrid of parallel-redundant system with additional fail-over segment within the articulated load sub-segments of the operation, deployed at each of the locations below:

·         Nigeria Centre for Disease Control, Abuja

·         The Nigerian Institute of Medical Research, Yaba, Lagos

·         Asokoro District Hospital, Abuja 

Abuja and Lagos

This website collects data via Google Analytics. Click here to opt in. Click here to opt out. ?