Client was concerned about energy costs and the possibility of optimization with utility grid supply by way of improved raw mains Power Quality. The solution was a hybrid of AVR and UPS, comprising 1000kVA AVR for a segment of the facility load and 200kW and 2 x 120kW UPS for other load segments more critical. The project was a reference in direct economic value of improved power quality in real terms as the power savings profile of the facility was immediately visible once the project was commissioned and it was possible to utilize otherwise unusable grid supply whenever available.

Onitsha, Anambra State