Projects

Chevron 2 x 160kVA UPS + 1hr Autonomy

Parallel redundant 2 x 160kVA UPS (in shared-load operation) was required for critical IT services and the Server operations at Chevron Escravos, also in Port-Harcourt. Desired system autonomy was 60 minutes on each 160kVA UPS, with long-life battery bank . . .

Read More »

Lead Capital

Customized solution comprising specially-matched project sub-systems performance criteria to achieve solution objectives . . .

Read More »

AB Inbev

The solution was a hybrid of AVR and UPS comprising 1MVA AVR for a segment of the facility load and 200kW + 2 x 120kW UPS for other load segments more critical. The project was a reference in direct cost savings from improved power quality in real terms . . .

Read More »

PZ Cussons Depots

Keeping critical operations running at PZ Depot outlets across Nigeria is a service Powerex has delivered for over 12 years, and still counting . . .

Read More »

Federal Palace Hotel

11 years of excellent, hassle-free operation is a testament to the right choice the client made in 2009 when the engaged Powerex to provide their 100kVA UPS . . .

Read More »

Aso Radio, Abuja

Quality broadcasting in FCT, backed up with 100kVA modular and 125kVA stand-alone UPSs with 150kVA AVR, with no fault report after nearly 10 years . . .

Read More »
?
This website collects data via Google Analytics. Click here to opt in. Click here to opt out.