Project cut across multiple locations, for a world-class HIV diagnostics program using Cobas 8800 and 6800 systems with a capacity for several thousands daily throughput tests per location, requiring highest availability / reliability power supply. Power solution was a hybrid of parallel-redundant system with additional fail-over segment within the articulated load sub-segments of the operation, deployed at each of the locations below:
· Nigeria Centre for Disease Control, Abuja
· The Nigerian Institute of Medical Research, Yaba, Lagos
· Asokoro District Hospital, Abuja
Abuja and Lagos