NAPIMS Data Centre
Turn-key project from design to delivery, comprising parallel 3 x 200kVA (2+1) UPS with 1-hour backup along with 1,000kVA AVR for a high-density Data Centre, cooling load automatic control with fail-over supply redundancy . . .
Turn-key project from design to delivery, comprising parallel 3 x 200kVA (2+1) UPS with 1-hour backup along with 1,000kVA AVR for a high-density Data Centre, cooling load automatic control with fail-over supply redundancy . . .
Parallel redundant 2 x 160kVA UPS (in shared-load operation) was required for critical IT services and the Server operations at Chevron Escravos, also in Port-Harcourt. Desired system autonomy was 60 minutes on each 160kVA UPS, with long-life battery bank . . .
Client needed a highly reliable continuous-duty 1,100kVA Frequency Converter for which Powerex offered a static model that has proven the right choice for nearly 8 years of 24/7 operation . . .
Project requirement was for 2 x 160kVA parallel redundant UPS in shared-load default operation + 1hr Autonomy for IT services and the Server load at Addax Lagos head office . . . .
Expert and comprehensive Technical Support services for Power Quality systems at Western Geco Data Center in Lagos over several years, with superior availability on the 4 x 40kVA Parallel Redundant UPS . . .
Provision of 40kVA UPS with Extended Backup and Remote Monitoring and Alarms via SNMP and 3G. The many years of seamless performance of the system attests to the details that accompanied this mid-scale, yet crucial project to client . . .
Specialty UPS with extended autonomy at an offshore location. The reliable performance has been exemplary for nearly 10 years without a report of fault, downtime or malfunction . . .